Devine, Texas · A Hyperscape Digital Campus

Your own building. Your team beside it.

Dedicated 10, 20 and 30 MW halls. One tenant per building. Forty minutes from downtown San Antonio. Four hundred megawatts of on-site generation — the grid is the expansion, not the wait.

10–30 MW
Dedicated halls
17
Single-tenant buildings
Mid 2028
First move-ins
40 min
To downtown San Antonio

The Campus

Seventeen buildings. One address on I-35.

Aerial view of the Sorgan Ridge campus at golden hour, corten and limestone halls set among live oaks.
Amenity core at the entrance. Seventeen tenant halls behind the gate line.
525 acres
Devine, Texas
Hwy 132 / I-35
Medina County
40 minutes
Downtown San Antonio
138 kV
On-site switchyard

Your Building

Pick your block. The building is yours.

One tenant per hall — your security boundary is the building envelope, not a cage.

Builder 10 MW

  • Seven-year initial term plus renewals
  • Right-sized for a first dedicated cluster
  • Six halls in the program
Growth 20 MW

  • Ten-year initial term plus renewals
  • Room to double without moving
  • Six halls in the program
Anchor 30 MW

  • Fifteen-year initial term plus renewals
  • Reserved residential block for your team
  • Five halls in the program
Team lives on site

Turnkey Delivery

We build the building. You rack the servers.

We deliver

  • Shell, structure and secured yard
  • Substation feed and utility power
  • Cooling plant — liquid-ready from day one
  • UPS and generator backup
  • White-space electrical distribution
  • 2,000–3,000 SF glass-front office suite
  • Loading dock, staging and burn-in space

You bring

  • Racks, servers and network gear
  • Your cluster architecture
  • Your team — they'll have desks on site
A completed Sorgan Ridge data hall at golden hour, corten steel over limestone, loading docks and an adjacent substation with generators; three workers in hard hats walk the apron.

That's the list. Time from lease signature to racks-in is measured in months, not years.

Power

Four hundred megawatts of gas. Four hundred of grid.

400 MW
Behind-the-meter gas

Plant COD May 2028

First hall ready for service mid 2028. Generation, not the queue.

400 MW
ERCOT grid

Follows in 2029

Campus path to 800 MW by 2030.

Power is metered at your hall and billed at cost under NNN. No landlord margin on your megawatts.

Availability

330 MW of critical IT. First halls mid 2028.

0 110 220 330 GAS · SR-1–SR-9 GRID · SR-10–SR-17 40 MW Q3 '28 100 MW Q4 '28 160 MW Q1 '29 220 MW Q3 '29 260 MW Q4 '29 330 MW Q4 '30

Gas halls SR-1–SR-9 deliver first. Grid halls SR-10–SR-17 follow. Halls assigned in signature order.

Reserve your hall

Pre-Leasing

Walk the site. Pick your hall.

Tell us what you're building. A member of our leasing team responds within one business day — with hall availability, commercial terms, and a tour date.