- Seven-year initial term plus renewals
- Right-sized for a first dedicated cluster
- Six halls in the program
Devine, Texas · A Hyperscape Digital Campus
Your own building. Your team beside it.
Dedicated 10, 20 and 30 MW halls. One tenant per building. Forty minutes from downtown San Antonio. Four hundred megawatts of on-site generation — the grid is the expansion, not the wait.
- 10–30 MW
- Dedicated halls
- 17
- Single-tenant buildings
- Mid 2028
- First move-ins
- 40 min
- To downtown San Antonio
The Campus
Seventeen buildings. One address on I-35.
- 525 acres
- Devine, Texas
- Hwy 132 / I-35
- Medina County
- 40 minutes
- Downtown San Antonio
- 138 kV
- On-site switchyard
Your Building
Pick your block. The building is yours.
One tenant per hall — your security boundary is the building envelope, not a cage.
- Ten-year initial term plus renewals
- Room to double without moving
- Six halls in the program
- Fifteen-year initial term plus renewals
- Reserved residential block for your team
- Five halls in the program
Turnkey Delivery
We build the building. You rack the servers.
We deliver
- Shell, structure and secured yard
- Substation feed and utility power
- Cooling plant — liquid-ready from day one
- UPS and generator backup
- White-space electrical distribution
- 2,000–3,000 SF glass-front office suite
- Loading dock, staging and burn-in space
You bring
- Racks, servers and network gear
- Your cluster architecture
- Your team — they'll have desks on site
That's the list. Time from lease signature to racks-in is measured in months, not years.
Power
Four hundred megawatts of gas. Four hundred of grid.
Plant COD May 2028
First hall ready for service mid 2028. Generation, not the queue.
Follows in 2029
Campus path to 800 MW by 2030.
Power is metered at your hall and billed at cost under NNN. No landlord margin on your megawatts.
Availability
330 MW of critical IT. First halls mid 2028.
Gas halls SR-1–SR-9 deliver first. Grid halls SR-10–SR-17 follow. Halls assigned in signature order.
Reserve your hallPre-Leasing
Walk the site. Pick your hall.
Tell us what you're building. A member of our leasing team responds within one business day — with hall availability, commercial terms, and a tour date.